Wind turbines
Gearbox and bearings warn weeks ahead in vibration and oil debris, long before temperature rises and the turbine stops.
In operation
The failures that matter
Five components, in order of impact.
Sibilla has Blueprints in operation for each of these. For every one: how it fails, what announces it, how early you can see it, and what it costs you.
-
1
Gearbox: bearing and gear damage
Downtime CostSurface fatigue starts in the high-speed and planetary bearings and on gear teeth. Debris spreads the damage through the gear train well before temperature rises.
- Signals
- High-frequency vibration (envelope, gear-mesh orders), oil debris particle count, oil and bearing temperature, active power.
- Typical warning time
- Weeks to months with vibration and oil debris; days if only temperature is watched. (indicative)
- Teneuro
- Yes. Accelerometers and acoustics where there is no CMS or the CMS is old. Oil analysis only with a dedicated sensor.
-
2
Main bearing: wear and spalling
Downtime CostHeavy, variable rotor loads and poor lubrication wear the rolling surfaces until material flakes off (spalling). The damage grows slowly.
- Signals
- Bearing temperature against load and ambient, low-frequency vibration, axial displacement.
- Typical warning time
- Months, but the vibration signal at low speed is weak. (indicative)
- Teneuro
- Yes. Low-frequency sensors, read with care.
-
3
Generator: bearing wear
Downtime CostDrive-end and non-drive-end bearings wear from lubrication loss, misalignment and shaft currents that mark the raceways.
- Signals
- Vibration, bearing and winding temperatures, current imbalance, converter alarms.
- Typical warning time
- Weeks for bearings; days for electrical events. (indicative)
- Teneuro
- Yes. Vibration and acoustics. The electrical side comes from the turbine SCADA.
-
4
Pitch system: hydraulic leaks, sensor faults
Downtime Safety/EnvLeaks and accumulators losing pre-charge slow the blade response; a faulty angle sensor makes the blades disagree. Pitch is the aerodynamic brake, so these faults also matter for safety.
- Signals
- Pitch angle deviation between blades, accumulator pressure and recharge time, pitch alarm frequency.
- Typical warning time
- Days to weeks. (indicative)
- Teneuro
- No. Usually not needed: 10-minute SCADA data and alarms are enough.
-
5
Converter: cooling failure
DowntimeClogged filters, worn pumps or fans and coolant loss reduce heat removal. The converter derates or trips, and the power modules age faster.
- Signals
- Coolant and power module temperatures against load and ambient, derating events, alarm frequency.
- Typical warning time
- Days to weeks. (indicative)
- Teneuro
- Partly. Pump and fan vibration and noise. Temperatures come from the turbine controller.
Also relevant
Outside the five above: not covered by a Blueprint today, we can work on them as a project.
- Blades: leading-edge erosion, cracks, unbalance and ice.
- Yaw system.
- Converter power modules (IGBTs).
Systems and connectors
What we usually find in the plant, and how we read it.
Read-only, without touching the machines. Three levels, stated plainly: Native, 1-day activation, Project-based.
| System | Via | Level | Prerequisite |
|---|---|---|---|
| AVEVA PI | PI Web API | Native | Read access to the customer's PI server. |
| Vibration CMS with data in AVEVA PI | AVEVA PI | Native | — |
| Bently Nevada System 1 | OPC or Modbus | 1-day activation | — |
| Siemens Gamesa SCADA | OPC UA | 1-day activation | Customer OPC UA interface active. Over IEC 60870-5-104 the link is project-based. |
| Nordex SCADA | OPC UA Customer Interface | 1-day activation | OPC UA customer interface purchased. With OPC XML-DA or IEC 60870-5-104 the link is project-based. |
| VestasOnline Business | OPC UA or ODBC | 1-day activation | OPC UA or ODBC already licensed. Otherwise project-based, as access depends on the OEM service contract. |
| ENERCON SCADA | Third-party interface agreed with the OEM | Project-based | — |
Trademarks belong to their respective owners and indicate technical compatibility only.
Limits
Where predictive maintenance does not pay off.
- Small, old turbines close to end of life or repowering.
- Sudden electronic failures with no precursor.
There, good preventive maintenance costs less. We will tell you before we start.
Standards
The references we work with.
- IEC 61400-25
- Turbine information model and communication; each OEM implements it differently, so tags are mapped site by site.
- ISO 16079-2
- Condition monitoring and diagnostics of the wind turbine drivetrain.
- ISO 20816-21
- Vibration evaluation for horizontal-axis wind turbines: nacelle, tower and drivetrain.
- ISO 14224
- Taxonomy of components and failure modes behind the Sibilla ontology.
- RDS-PP (VGB-S-823)
- Plant designation system for wind farms, used to map tags to components.
Our solutions on this asset
Sibilla
Blueprints in operation on the five components above: KDIs, expected degradation patterns, links to the fault tree.
Discover Sibilla →Teneuro
Where the data is not there: vibration and sound, fieldbuses and the signals of silent machines, sent to Sibilla.
Discover Teneuro →Before Plasmiam, our team designed and ran predictive maintenance for a major international utility: more than 1,000 power plants in 22 countries and over 40 GW of installed capacity, starting from hydro. That experience shaped Teneuro, designed, built and patented by Plasmiam to bring vibration monitoring to large fleets of small plants at a low cost per point.
Tell us what you run. We'll show you how it fails and when you'd notice.
Sources
- ISO 16079-2:2020, condition monitoring of the wind turbine drivetrain
- ISO 20816-21:2025
- Gearbox condition monitoring in wind turbines: a review
Last updated 3 October 2026. Warning times are indicative orders of magnitude from literature and practice: they depend on the duty profile and are validated on your fleet.